De Lisle College is a 1,200 pupil secondary school in Loughborough, Leicestershire. The college contacted Danaher & Walsh APS to come up with a cost-effective solution to some troublesome ...
Case Studies
Danaher & Walsh APS is able to deliver innovative solutions for most pipeline rehabilitation challenges, no matter how complex.
Our skilled, experienced team has an enviable track record of delivering quality solutions to a vast range of pipeline repair problems in challenging environments.
As well as offering a wide range of advanced techniques and processes, we are able to think creatively to deliver a cost-effective and fit-for-purpose repair for even the most challenging situations.
By using some of the best remote-control imaging systems available, together with our impressive in-house expertise, we can provide technical advice that you can trust, enabling you to make informed decisions.
Just ask!
Contact us today, and challenge us to cure your pipeline issues.
Related case studies
Danaher & Walsh was appointed by nmcn PLC to carry out specialist lining works at a sewage treatment works facility on the Channel Island of Jersey.
Camberwell Old Cemetery in London was suffering from flooding, owing to a storm sewer evidently being damaged by tree roots.
Danaher and Walsh APS was called to a collapsed concrete pipe believed to be 150mm in diameter outside of Fairhaven Church in Freiston, Boston. However, on arrival it was quickly ...
One of the first SpeedyLight+ UV LED installations in the UK took place at a domestic property in Caistor, Lincolnshire, on behalf of Anglian Water.
Anglian Water were in the process of laying a brand new 600mm water main under Burgh Road, one of the two main roads into the busy seaside resort of Skegness ...
Danaher & Walsh APS was faced with a challenging sewer collapse in a residential area of Stamford, Lincolnshire.
The collapsed sewer ran along the length of a narrow access road ...
Danaher & Walsh APS was called upon to solve an unforeseen problem at a leisure centre under major refurbishment in Hull.
A sewer had become blocked underneath a narrow access road on a residential street in Lincoln.
A badly collapsed 150mm sewer in Fiskerton, Lincolnshire, posed a significant challenge as it was located underneath a customer’s garage.
Danaher & Walsh APS was called upon to carry out an ambitious project, which involved refurbishing 1.3km of abandoned 600mm combined sewer in order to provide flood alleviation water ...