Carrington Street, Nottingham

Scheme Strengthening of a Victorian railway bridge
Location Carrington Street,
Nottingham
Date Start: July 2007
Finish: November 2007
Contract Period 17 weeks
Contract Value £360,000
Client Nottingham City Council
Engineer

Chris Capewell 
Nottingham City Engineers



  

The deck of the Victorian bridge over the main railway lines into the station was removed and replaced with a reinforced concrete slab which was sealed with a protective waterproof membrane to prevent damage by salted winter gritting and water ingress. 
Carrington Street is a major road in the City of Nottingham, passing in front of the Train Station. The works were undertaken without any disruption to the train services and with the road remaining open with a single lane in each direction.